施工準(zhǔn)備工作對防滲膜的技術(shù)要求 |
|
施工準(zhǔn)備工作對防滲膜的技術(shù)要求 做防滲防腐前,對池體進(jìn)行清理找平。鋪設(shè)表面垂直深度25mm內(nèi)不得有尖銳雜物:如瓦礫、石子、混凝土顆粒、鋼筋頭、金屬或其他碎屑等足以刺穿HDPE防滲膜之雜物。HDPE防滲膜為柔性材料,可根據(jù)池體的任何結(jié)構(gòu),做任何造型的包裹襯里。所有拐角、直角部分,均應(yīng)做成圓角或倒角,避免損壞HDPE防滲膜。鋪設(shè)完,應(yīng)緊接著焊接,管道節(jié)點(diǎn)、陰陽角、拐角等難處理的地方,可配合熱風(fēng)機(jī)和擠出式焊機(jī)進(jìn)行焊接。鋪設(shè)到要求位置,返邊于墻內(nèi),砌磚固定。 Seepage before coating leveling, cleaning of the tank body. The laying of sharp debris shall not vertical depth of surface 25mm: such as debris rubble, stone, concrete, steel particles, metal or other materials to pierce HDPE impervious membrane. HDPE impervious membrane is flexible material, can be based on any structure of the pool body, do any modeling package lining. All corner, rectangular section, should be made of rounded or chamfered, avoid damaging the HDPE impervious membrane. After laying, should immediately after welding, pipe joints, yin-yang angle, corner of a tricky place, with hot air and extrusion welding. Laying position request, back side walls, brick fixed. 產(chǎn)品信息網(wǎng)站:http://wxyhx.cn/ |
|
|
|
|
|